Greater London · around 36,700 residents
Wet Room Installation in Stratford
Wet Room Installation in Stratford typically costs £7,150–£16,250 including VAT and takes 8–14 working days.
If you're planning wet room installation in Stratford, you'll want an installer who turns up on the agreed day and finishes on the agreed day. That's what we're set up for, across Stratford and the wider Greater London area.
Get a guide priceInstalling bathrooms in Stratford
Stratford is roughly 6 km from Barking and home to about 36,700 people. Between converted flats and 1930s semis, no two bathrooms are the same, so every quote is based on a measured survey rather than a guess over the phone.
Hard water is a fact of life around Stratford. It shortens the life of shower cartridges and leaves marks on glass, so we fit valves that are easy to service and can add a scale inhibitor when we're on the main.
Included as standard
- Floor survey (timber joists or concrete)
- Wet room former or screed with falls
- Full tanking membrane to BS 5385
- Linear or centre drain
Where the money goes in Stratford
- Labour ~53%
- Materials & sundries ~41%
- Waste & disposal ~6%
Typical split for this job type in Greater London; your survey quote itemises your own job. Stratford is about 6 km from Barking.
Do you need approval in Stratford?
In England, most like-for-like bathroom refits don't need building regulations approval, but new electrical circuits or work in the shower zones are notifiable under Part P, new drainage falls under Part H and extractor fans must meet Part F. We use registered electricians who self-certify, and you get the certificate.