Greater London · around 15,200 residents

Wet Room Installation in Palmers Green

Wet Room Installation in Palmers Green typically costs £7,150–£16,250 including VAT and takes 8–14 working days.

Looking for wet room installation in Palmers Green? Our installers cover Palmers Green and the rest of Greater London, and every job starts with a free survey so the price you get is fixed before any work begins.

Get a guide price

Ask for a quote

Or call 0800 088 6341

Installing bathrooms in Palmers Green

With roughly 15,200 people, Palmers Green sits about 6 km from Archway. Much of the housing is mansion blocks and Victorian and Edwardian terraces, and bathrooms in these homes tend to be compact, so layout planning matters as much as the suite you choose.

Hard water is a fact of life around Palmers Green. It shortens the life of shower cartridges and leaves marks on glass, so we fit valves that are easy to service and can add a scale inhibitor when we're on the main.

Included as standard

  • Glass screen and fittings
  • Floor survey (timber joists or concrete)
  • Wet room former or screed with falls
  • Full tanking membrane to BS 5385

See the full wet room installation process

Where the money goes in Palmers Green

  • Labour ~46%
  • Materials & sundries ~48%
  • Waste & disposal ~6%

Typical split for this job type in Greater London; your survey quote itemises your own job. Palmers Green is about 6 km from Archway.

Do you need approval in Palmers Green?

In England, most like-for-like bathroom refits don't need building regulations approval, but new electrical circuits or work in the shower zones are notifiable under Part P, new drainage falls under Part H and extractor fans must meet Part F. We use registered electricians who self-certify, and you get the certificate.

Wet Room Installation in Palmers Green: questions

How much does wet room installation cost in Palmers Green?
Most wet room installation jobs in Palmers Green cost between £7,150 and £16,250 including VAT. The final figure depends on room size, the suite you choose and what we find behind the old tiles, and we confirm it in a fixed written quote after a free survey.
How long does wet room installation take?
Allow 8–14 working days. We give you a start date and a planned finish date before work begins, and we keep a working toilet available wherever the layout allows.
When can you start in Palmers Green?
After the survey we offer the next available start date. Booking a few weeks ahead gives time for your suite and tiles to arrive and be checked.

Ready to book your bathroom installer?

Free survey, fixed written quote, one team from strip-out to handover.

CallGuide price