Edinburgh and the Lothians · around 16,200 residents

Wet Room Installation in Penicuik

Wet Room Installation in Penicuik typically costs £5,450–£12,400 including VAT and takes 8–14 working days.

Looking for wet room installation in Penicuik? Our installers cover Penicuik and the rest of Edinburgh and the Lothians, and every job starts with a free survey so the price you get is fixed before any work begins.

Get a guide price

Ask for a quote

Or call 0800 088 6341

Installing bathrooms in Penicuik

With roughly 16,200 people, Penicuik sits about 14 km from Edinburgh. Much of the housing is newer estates and tenement flats, and bathrooms in these homes tend to be compact, so layout planning matters as much as the suite you choose.

Soft water around Penicuik means very little limescale. We focus instead on ventilation and sealing so the room stays dry.

Included as standard

  • Wet room former or screed with falls
  • Full tanking membrane to BS 5385
  • Linear or centre drain
  • Floor and wall tiling

See the full wet room installation process

Where the money goes in Penicuik

  • Labour ~55%
  • Materials & sundries ~39%
  • Waste & disposal ~6%

Typical split for this job type in Edinburgh and the Lothians; your survey quote itemises your own job. Penicuik is about 14 km from Edinburgh.

Do you need approval in Penicuik?

In Scotland, a building warrant from the local authority is needed for some bathroom work, such as new drainage or altering structure, under the Scottish Building Standards. A like-for-like refit usually doesn't need one, and electrical work is certified to BS 7671.

Wet Room Installation in Penicuik: questions

How much does wet room installation cost in Penicuik?
Most wet room installation jobs in Penicuik cost between £5,450 and £12,400 including VAT. The final figure depends on room size, the suite you choose and what we find behind the old tiles, and we confirm it in a fixed written quote after a free survey.
How long does wet room installation take?
Allow 8–14 working days. We give you a start date and a planned finish date before work begins, and we keep a working toilet available wherever the layout allows.
When can you start in Penicuik?
After the survey we offer the next available start date. Booking a few weeks ahead gives time for your suite and tiles to arrive and be checked.

Ready to book your bathroom installer?

Free survey, fixed written quote, one team from strip-out to handover.

CallGuide price