County Londonderry · around 25,700 residents

Landlord & Rental Bathroom Installation in Coleraine

Landlord & Rental Bathroom Installation in Coleraine typically costs £3,150–£6,750 including VAT and takes 4–7 working days.

Landlord & Rental Bathroom Installation in Coleraine is our core work. We survey, quote a fixed price in writing, and then install with our own team, keeping you updated at the end of each day.

Get a guide price

Ask for a quote

Or call 0800 088 6341

Installing bathrooms in Coleraine

Coleraine is roughly 76 km from Belfast and home to about 25,700 people. Between bungalows and newer estates, no two bathrooms are the same, so every quote is based on a measured survey rather than a guess over the phone.

Coleraine has soft water, so limescale isn't a big concern. Good ventilation matters more here, and we size extractor fans to the room.

Included as standard

  • Extractor fan sized to the room
  • Electrical certificate where work is notifiable
  • Fixed price per bathroom for multiple properties
  • Durable mid-range suite and thermostatic shower

See the full landlord & rental bathroom installation process

Where the money goes in Coleraine

  • Labour ~45%
  • Materials & sundries ~49%
  • Waste & disposal ~6%

Typical split for this job type in County Londonderry; your survey quote itemises your own job. Coleraine is about 76 km from Belfast.

Do you need approval in Coleraine?

In Northern Ireland, the Building Regulations (Northern Ireland) apply, administered by your council's building control. Like-for-like replacements are usually exempt, while new drainage, structural changes and some ventilation work need approval; electrical work is tested and certified to BS 7671.

Landlord & Rental Bathroom Installation in Coleraine: questions

How much does landlord & rental bathroom installation cost in Coleraine?
Most landlord & rental bathroom installation jobs in Coleraine cost between £3,150 and £6,750 including VAT. The final figure depends on room size, the suite you choose and what we find behind the old tiles, and we confirm it in a fixed written quote after a free survey.
How long does landlord & rental bathroom installation take?
Allow 4–7 working days. We give you a start date and a planned finish date before work begins, and we keep a working toilet available wherever the layout allows.
Will I need building regulations approval in Coleraine?
Usually not for a like-for-like refit, but new electrics in wet zones and new drainage can be notifiable. We handle the paperwork and give you the certificates.

Ready to book your bathroom installer?

Free survey, fixed written quote, one team from strip-out to handover.

CallGuide price