What happens on each day of a bathroom installation?

A typical job runs strip-out, first fix, boarding and tiling, fitting the suite, then second fix and handover.

Day by day

  1. Strip-out — protection laid, water isolated, old suite removed.
  2. First fix — pipes, wastes and cables run.
  3. Boarding and tanking — walls prepared and waterproofed.
  4. Tiling — walls and floor tiled and grouted.
  5. Fitting — suite and furniture installed.
  6. Second fix and handover — electrics finished, everything tested.

Updated November 2026 by the Bathroom Installers team.