How long does a bathroom installation take?
Most full bathroom installations take 7 to 12 working days; a shower or suite swap can take 1 to 4 days.
Typical timescales
- Full bathroom refit: 7–12 working days
- Wet room: 8–14 days
- En-suite: 6–12 days
- Bath-to-shower: 3–5 days
- Shower only: 1–2 days
What causes delays?
Missing or damaged parts, rotten floorboards and waiting for plaster or screed to dry. We check deliveries on day one to avoid the first.
Updated November 2026 by the Bathroom Installers team.
★ Add us as a preferred source on Google