Greater London · around 93,900 residents

Bathroom Suite Replacement in Hayes

Bathroom Suite Replacement in Hayes typically costs £1,950–£4,900 including VAT and takes 2–4 working days.

Looking for bathroom suite replacement in Hayes? Our installers cover Hayes and the rest of Greater London, and every job starts with a free survey so the price you get is fixed before any work begins.

Get a guide price

Ask for a quote

Or call 0800 088 6341

Installing bathrooms in Hayes

With roughly 93,900 people, Hayes sits about 9 km from Brent. Much of the housing is converted flats and 1930s semis, and bathrooms in these homes tend to be compact, so layout planning matters as much as the suite you choose.

Water in Hayes is very hard, so limescale builds up quickly on glass, taps and shower heads. We recommend easy-clean glass coatings, thermostatic valves with removable filters, and fitting a scale reducer on the incoming main.

Included as standard

  • Patch tiling or panels where needed
  • Silicone and testing
  • Removal of old suite
  • New bath, basin and WC fitted in place

See the full bathroom suite replacement process

Where the money goes in Hayes

  • Labour ~55%
  • Materials & sundries ~39%
  • Waste & disposal ~6%

Typical split for this job type in Greater London; your survey quote itemises your own job. Hayes is about 9 km from Brent.

Do you need approval in Hayes?

In England, most like-for-like bathroom refits don't need building regulations approval, but new electrical circuits or work in the shower zones are notifiable under Part P, new drainage falls under Part H and extractor fans must meet Part F. We use registered electricians who self-certify, and you get the certificate.

Bathroom Suite Replacement in Hayes: questions

How much does bathroom suite replacement cost in Hayes?
Most bathroom suite replacement jobs in Hayes cost between £1,950 and £4,900 including VAT. The final figure depends on room size, the suite you choose and what we find behind the old tiles, and we confirm it in a fixed written quote after a free survey.
How long does bathroom suite replacement take?
Allow 2–4 working days. We give you a start date and a planned finish date before work begins, and we keep a working toilet available wherever the layout allows.
Will I need building regulations approval in Hayes?
Usually not for a like-for-like refit, but new electrics in wet zones and new drainage can be notifiable. We handle the paperwork and give you the certificates.

Ready to book your bathroom installer?

Free survey, fixed written quote, one team from strip-out to handover.

CallGuide price