Greater London · around 41,000 residents
Bathroom Installation in Welling
Bathroom Installation in Welling typically costs £6,450–£14,200 including VAT and takes 7–12 working days.
Bathroom Installation in Welling is our core work. We survey, quote a fixed price in writing, and then install with our own team, keeping you updated at the end of each day.
Get a guide priceInstalling bathrooms in Welling
Welling has around 41,000 residents and a mix of Victorian and Edwardian terraces and converted flats. Older properties often hide surprises behind tiles, such as lead pipework or uneven walls, which is why we survey before we price.
Hard water is a fact of life around Welling. It shortens the life of shower cartridges and leaves marks on glass, so we fit valves that are easy to service and can add a scale inhibitor when we're on the main.
Included as standard
- Suite, brassware and furniture fitting
- Second-fix electrics by a qualified electrician
- Silicone, snagging and handover
- Strip-out and waste removal
Where the money goes in Welling
- Labour ~53%
- Materials & sundries ~41%
- Waste & disposal ~6%
Typical split for this job type in Greater London; your survey quote itemises your own job. Welling is about 4 km from Bexley.
Do you need approval in Welling?
In England, most like-for-like bathroom refits don't need building regulations approval, but new electrical circuits or work in the shower zones are notifiable under Part P, new drainage falls under Part H and extractor fans must meet Part F. We use registered electricians who self-certify, and you get the certificate.